Hot Tub Site Preparation Checklist

A practical pre-install checklist to make delivery day smooth and reduce setup issues.

Serving Santa Rosa & surrounding communities

Site Preparation Checklist Before Delivery

Pad and ground prep

  • Choose a stable, level base with proper load support. A solid base helps protect shell alignment and long-term spa performance.
  • Confirm drainage path away from home foundation. Good drainage lowers slip risk and protects nearby structures.
  • Measure final dimensions including cover movement space. Extra clearance planning prevents costly repositioning later.

Access and utility prep

  • Measure gate openings and turning clearances. Delivery path checks reduce delays and crane surprises on install day.
  • Clear delivery route of furniture and obstacles. A clean path helps crews move safely and protect your property.
  • Confirm electrical planning is scheduled and documented. Utility readiness keeps startup and inspection on track.

Video Tutorial

Video: Site-prep walkthrough covering delivery access and installation readiness.

Related Guides

Next Step

Want help verifying your install location? Schedule a local pre-delivery site check before delivery day.