Hot Tub Site Preparation Checklist
A practical pre-install checklist to make delivery day smooth and reduce setup issues.
Serving Santa Rosa & surrounding communities
Site Preparation Checklist Before Delivery
Pad and ground prep
- Choose a stable, level base with proper load support. A solid base helps protect shell alignment and long-term spa performance.
- Confirm drainage path away from home foundation. Good drainage lowers slip risk and protects nearby structures.
- Measure final dimensions including cover movement space. Extra clearance planning prevents costly repositioning later.
Access and utility prep
- Measure gate openings and turning clearances. Delivery path checks reduce delays and crane surprises on install day.
- Clear delivery route of furniture and obstacles. A clean path helps crews move safely and protect your property.
- Confirm electrical planning is scheduled and documented. Utility readiness keeps startup and inspection on track.
Video Tutorial
Video: Site-prep walkthrough covering delivery access and installation readiness.
Related Guides
Next Step
Want help verifying your install location? Schedule a local pre-delivery site check before delivery day.